Secure I.T Environments Ltd was awarded the contract to design and build a new primary data centre for Queen Elizabeth Hospital. The external modular data centre design incorporated 20 cabinets, full power supply infrastructure including generator hook up, hot aisle capture configuration for energy efficiency, Novec Fire suppression and Wagner early particle detection to ensure safety as well as energy efficient air conditioning and UPS systems in an N+1 format and all 19” cabinets included intelligent power distribution. The new 80 sqm data centre was completed in fourteen weeks.

Download the full case study here