The data centre at Solihull Council is starting to take shape. New stud walling has been erected today following the steel pillars being fitted within the ground floor of the car park to support the new DC structure. Ventilation pipes have also been installed as part of the air conditioning and cooling for the new facility. It wont be long before this space is looking much more like a bespoke data centre with full energy efficient infrastructure.SMBC stripped out ventilation ductwork Just a matter of weeks to completion!SMBC Stud partitioning