SMBC offload of steels using hiab crane SMBC project - Delivery lorry with steels on SMBC Room area prior to install of steels SMBC steel delivered into room on 1 ton flat trucks SMBC steels in position SMBC steels laid into position within the roomIn roll the steel joists….. The data centre, which is currently being constructed on the mid-level car park at Solihull Council, ┬áhas 8 steel pillars which will be attached to the cross member to form the structural load bearing of the mid-level floor. The steel structures sit within the foundations which we created a couple of weeks back on the lower car park. Once the steels are squared up, we will be bolting them together. Another step closer to the data centre completion.