Not on this occasion but we are ‘diamond drilling’ to make bore holes in the middle level car park at Solihull Borough Council. These holes will be used for steel supports that will go through to the lower level car park to provide extra support.

Groundwork is under way to form concrete footings for these steel supports. The traditional build data centre will be housed within the car park – utilising available space to acquire a new DC facility.

 

second pic

Diamond drilling at Solihull data centre build