The Christmas holidays have not slowed down the Secure IT Environments team over in Northampton! The next phase of the new data centre build is well under way. Due to the restrictions in the car park we hired a concrete pump vehicle to ensure the minimum disruption to the hospital’s car parking area. Then a steel mesh grid and ring beam was installed to provide maximum strength to the building base. Full steam ahead!Northampton-20131218-00302 Northampton-20131218-00303