Downloads

IMetre Brochure
IMetre Brochure

IMetre - Changing the way power is monitored. Intelligent, reliable and accurate power monitoring without any downtime.

Server Lift Brochure
Server Lift Brochure

Brochure highlighting the features, benefits, specification and performance features of server lifts.

Server Lift Benefits
Server Lift Benefits

Benefits of Server Lifts

Master MHF Series
Master MHF Series

Master MHF Series

MultiPlus 10-20kVA
MultiPlus 10-20kVA

MultiPlus 10-20kVA

MultiDialog MDT 60-80kVA
MultiDialog MDT 60-80kVA

MultiDialog MDT 60-80kVA

MasterSwitch
MasterSwitch

MasterSwitch

MasterPlus Industrial
MasterPlus Industrial

MasterPlus Industrial

MasterPlus 400Hz
MasterPlus 400Hz

MasterPlus 400Hz 30-120kVA

MasterPlus HIP 100-250kVA
MasterPlus HIP 100-250kVA

MasterPlus HIP 100-250kVA

Air Quality Assessment
Air Quality Assessment

Protect Your Data Centre Equipment - Check the Air Quality

Safe Contractor Accreditation
Safe Contractor Accreditation

Safe Contractor Accreditation Certificate

Construction Line Membership Certificate
Construction Line Membership Certificate

Construction Line Membership Certificate

Data Centre Energy Efficiency Framework
Data Centre Energy Efficiency Framework


The Data Center Energy Efficiency Framework (DCEEF) is a set of best practices for reducing data center energy consumption.


EU Code of Conduct Best Practices V 2.0.0
EU Code of Conduct Best Practices V 2.0.0

Updated EU Code of Conduct Best Practices 2011

Co-location Cabinets
Co-location Cabinets

Co-location server cabinets

301 Series Enclosures
301 Series Enclosures

Multi-Function enclosures

101 Series Enclosures
101 Series Enclosures

Floor standing enclosures

ISO 14001
ISO 14001

ISO 14001 Certification

ISO 9001
ISO 9001

ISO 9001 Certification

Quality Policy
Quality Policy

Secure I.T. Environments 'Quality Policy' document

Environmental Policy
Environmental Policy

Secure I.T. Environments, environmental policy document

Airflow Brochure
Airflow Brochure

Airflow Brochure

Blanking Panel
Blanking Panel

Blanking Planel

Cool Control Seal
Cool Control Seal

Cool Control Seal

Data Center Design Guide
Data Center Design Guide

Data Center Design Guide

Extended Raised Floor Grommets
Extended Raised Floor Grommets

Extended Raised Floor Grommets

Brush Strip Raised Floor Grommets
Brush Strip Raised Floor Grommets

KoldLok PG - Secure IT

UPS 80-100KVA
UPS 80-100KVA

MasterDialog

UPS 100-800kVA
UPS 100-800kVA

MasterPlus 100-800kVA

UPS 100-250kVA 3-3
UPS 100-250kVA 3-3

MasterPlus HIP 100-250kVA 3-3

UPS 60-80kVA
UPS 60-80kVA

MultiDialog MDT 60-80kVA 3-3

Sealing Products
Sealing Products

Sealing Products

Cool Cabinet Enclosures
Cool Cabinet Enclosures

High capacity cooling solutions

SITE General Brochure
SITE General Brochure

SITE General Brochure

Thermal Optimisation
Thermal Optimisation

Thermal Optimisation in the Data Centre

White Paper: Fluid Dynamics Analysis
White Paper: Fluid Dynamics Analysis

Two-dimensional computational fluid dynamics analysis of blanking panel solutions

Measuring Data Center Productivity
Measuring Data Center Productivity

Proxies proposals for measuring data center productivity

Latest News Recent Projects Contact Us
Latest News
Our Kindle Winner
Steven Le Lere was our lucky winner at the recent Gov ICT exhibition at QEII. Steven is now the...
GovICT 2012

The latest govICT conference focused on key developments in cloud computing, agile development...

Government ICT Strategy.... what's new?

Join us at the next GovNet ICT Conference at QEII on Tuesday 31st January to find...

Latest Projects
Education New External Data Centre Project

A University required a new standalone Modular Data Centre and associated infrastructure to meet the projected increase in user demand and meet long-term carbon savings,  plus targets for energy from renewable sources.

Commercial Co-Hosting Phase 2

The supply, install and commission of phase 2, holding 60 cabinets and the infrastructure for the future power upgrade for a telecommunications company. Room size: 224m2

NHS New Modular Server Room

Following the reorganisation of its I.T. infrastructure, a new Data Centre was commissioned, with an 11 week timetable. Room size: 146m2

Contact Us

Secure I.T. Environments Ltd.
9 Shortmead Street
Biggleswade
Bedfordshire
SG18 0AT

t. 01983 885 182
f. 01983 885 183
e. enqu...@siteltd.co.uk